Thickened bathroom curtain shower curtain waterproof curtain Nordic printing pattern various pattern curtain curtain partition curtain
Product display:
The hanging method of the shower curtain:
One is to install a flexible shower curtain track, and the other is to install a shower curtain rod.
Special attention should be paid to the installation of flexible shower curtain rails.
Today, bathrooms will be installed with aluminum gussets, and flexible shower curtain rails will be installed on aluminum gussets. Therefore, it is necessary to determine the specific installation position of the track, and then strengthen the keel at the corresponding position. Shower curtain rods are divided into expansion rods and fixed on the wall with nuts. If you use a straight shower curtain rod at home and have wall support points on both sides, you can choose an expansion rod. This shower curtain rod is easy to install and move, and you can also use a bath towel or the like. For curved shower curtain rods, it is better to choose two ends that are fixed to the wall with nuts. It is also safer to choose stainless steel tubes, and the thicker and stronger ones must be used.
Be attention:
The choice of shower curtain. The length of the shower curtain must be appropriate, and the hem should be about 2 cm from the ground. Choosing the right shower curtain can add a lot of color to the bathroom.
Name: | Shower Curtain |
Material: | 100% Polyester |
Size: | Customized |
Pattern & Color: | Our design or customized |
Sample date | Finished product—3days, Custom product—5-7 dyas |
Package: | 1 pc/polybag, 50 pcs/carton |
MOQ: | 2pcs |
Delivery: | 5-25days depend on product or quantity |
Sample: | 1. The sample fee is displayed on the product details page
2. Shipping costs are paid by the buyer Offer sample printed towel before make an order. |
Sample Time: | 1. About 3~5 days for our existing samples
2. About 5-10 days for customized samples |
Lead Time: | About 20~40 days after sample approved |
Payment: | T/T, Paypal, Bank Transfer |
Shipment: | 1. Loading Port: Ningbo Port / Shanghai Port
2. By Sea / By Air / By Express etc. 3. EXW / FOB / CNF / CIF / DDP / DDU / FCA |
Packing: | 1. Opp Bag
2. Carton 3. Courier bag 4. Or custom packaging |
- Supply Ability:3000 Piece/Pieces per Month
Quantity(Pieces) | 1 – 100 | 101 – 1000 | 1001 – 5000 | >5000 |
Est. Time(days) | 3 | 7 | 15 | To be negotiated |